国产女同性恋一区二区 I 国产一线av I 成年人免费在线观看网站 I 可以在线看的av I 久久中文字幕国产 I 日韩欧美在线视频免费 I 久久香蕉国产线看观看导航 I 动漫调教 I 麻豆传播媒体免费观看 I 女人爽到喷水的视频大全 I 视频一区在线免费观看 I 香蕉av影院 I 97久久精品人人 I 爱情岛黄色 I 亚洲精品蜜桃久久久久久 I 天天亚洲精品 I 91色精品 I 日韩精品一区二区免费视频 I 美女黄的全免费 I 亚洲精品一区国产精品 I 欧美性色大片在线观看 I 又黄又爽又色视频免费 I 亚洲香蕉 I 亚洲最大日夜无码中文字幕 I 久久精品国产99精品丝袜 I 电影《女心理师》 I 亚洲欧美日韩在线一区二区 I 天天操天天狠 I 国产精品久久久久久久模特 I 国产专区在线视频 I 手机福利在线观看 I 性感保姆在线观看 I 正在播放国产一区 I 亚洲午夜一区二区三区 I 自拍偷拍一区 I 99精品免费在线 I 视频精品 I 日本在线观看a I www.欧美视频 I 忘忧草社区在线www I 久久www成人免费网站 I 影音先锋亚洲精品 I 亚洲欧美成人a∨观看 I 久久久精品国产 I 少妇的诱惑在线看 I 无码国产精成人午夜视频 I 免费色网站 I 青青青国产依人在线 I aaa免费av I 日韩av一区二区三区在线观看 I 日批大全 I 九色在线看 I 久久久久亚洲av成人人电影 I 午夜v I 人人澡人人澡人人澡 I 日本国产精品一区 I free性护士vidos欧美

Hello, welcome to Xuzhou Tenglong Steel Structure Technology Co., Ltd. official website!

Your Current Location:Home > News > INDUSTRY DYNAMIC

Technical guarantee measures of steel structure workshop engineering
release time:2019/4/25 23:38:33      hit count:2238

Technical guarantee measures of steel structure workshop engineering

In order to ensure that the fabrication and installation of your steel structure meet the established standards, the following measures are hereby formulated:

1, in strict accordance with the "steel structure engineering construction and acceptance code" gb50205-2001 provisions of the material, line, material, group, welding technical requirements for the steel structure production, hoisting.

2, roof support, steel beam roof beam and other components according to 1:1 lofting, blanking, and considering the contraction of the weld.

3. H-shaped steel group vertical welding machine, submerged arc welding machine, h-shaped steel rectification machine, leveller and other equipment are used for processing, welding and rectification of h-shaped steel group.

4. The friction contact surface of components shall be constructed in accordance with the reasonable construction process. After treatment, the friction surface of components shall not be painted or defaced. The friction coefficient test adopts bolt specimen. The friction treatment, material, high-strength bolt and component are the same, and the friction coefficient is 0.45.

5. The bolt connection hole shall be drilled by CNC drilling machine and its pass rate shall be checked.

6. Pre-assembly of components before leaving the factory, and record the assembly.

7. Hoist steel column and other vertical long-shaped members with the lifting point at 2/3 of the column length. Hoisting roof truss beam and other components, the lifting point is set at equal distance from the key position.

8. Pay attention to the influence of wind force, sunshine temperature and temperature difference during alignment correction of steel column. Therefore, no correction shall be made when the wind force exceeds level 5. Install or reinforce the side beams of the corrected columns immediately. Calibration should be carried out in the morning or when the sun is cooler and in the environment.

9, the production of glass commissioned professional glass manufacturers production and processing. The production of glass shall be in accordance with the current national standards and specifications, and the owner shall confirm the product samples, and provide relevant test reports and supporting documents.

Before the installation of steel structure, the foundation shall be retested to ensure that it meets the installation requirements. During the installation of steel structure, the measurement and correction shall be carried out and the error shall be controlled within the allowed range.

11. Carry out a comprehensive self-correction and self-inspection in accordance with the installation manual and acceptance standards to prevent errors in the work. The quality inspector should make a detailed inspection and record of the work every day, and check the quality together with the owner's representative and on-site project supervisor.

12. Check the material and quality guarantee of the steel. The quality guarantee shall mainly pay attention to the data of yield point, cold bending, room temperature impact and carbon content.

13. Self-inspection and mutual inspection shall be carried out in the process of steel structure fabrication, and special inspection shall be carried out in strict accordance with the steel structure engineering quality inspection and evaluation standard gb50211-95.

18, h-shaped steel plate butt weld inspection, to meet the second-grade weld quality standards.

19. Code for construction and acceptance of steel structure: pay attention to the protection of finished product paint and deformation during transportation. The components are tied firmly, and the binding place is protected by rubber pad to avoid damage of ring paint. And according to the shape of transport vehicles, components of the production of supporting transport frame to prevent deformation.

20. Check the matching conditions of the column foundation axis, the column foot bolts and the bolt holes on the column bottom plate before lifting.

21. After hoisting the steel column, the surveyor shall timely measure, correct and prepare for hoisting the roof truss beam.


News you are interested in
Previous:Jiangsu steel structure development direction of four major advantages
Next:Construction technology of steel structure engineering

Back to list

主站蜘蛛池模板: 舞钢市| 华坪县| 城市| 荣成市| 隆昌县| 江阴市| 绥德县| 鹤壁市| 应用必备| 文山县| 玉田县| 平邑县| 六盘水市| 林口县| 贵溪市| 文昌市| 晴隆县| 浪卡子县| 上高县| 滨州市| 黎平县| 万宁市| 张家界市| 玉田县| 葵青区| 伊通| 遵义市| 沂源县| 乌审旗| 蒲城县| 武宣县| 肇州县| 绥德县| 政和县| 天峻县| 凤阳县| 昭觉县| 柏乡县| 四平市| 舒城县| 武宁县|